I've been hanging onto my hat lately, y'all. It has been a wild rush to wrap up all of our selects with vendors for the new lake house build so we can finish the contract. Once we've signed on the dotted line with our builder, he says we'll have the slab poured in 3-4 weeks. That would be a real TREAT for halloween. Our plans have been submitted to the HOA architectural review committee, so we hope to have that approval shortly.
Over the course of the last ten days or so, we've had second or third appointments to revisit prior selects and/or pick plumbing fixtures, appliances, lighting, doors, flooring, windows, cabinets, blah blah blah. At this point, the only big choice I still need to nail down is the flooring we'll use throughout the house. That's a big swath of flooring, and I want to get it just right. The bath tiles have been chosen and I love them. But the wood flooring has me stymied since I'm tying in beams and a big floor-to-ceiling brick fireplace through the common area spaces. Several times now I've pulled in my San Antonio decorator Robin for consults, and she swears we'll get the flooring chosen asap.
Then there's the lone light fixture I forgot we added over the floating shelf in the wet bar. As you can see below, I've got a bead on the direction to take with that. I sent these inspiration pics to our lighting consultant and am hoping he'll pull several good options for me to come see in a few days.
No comments:
Post a Comment